ISCOM2924GF 4GE 4C Quick Installation Guide (A 01)


www.raisecom.com
ISCOM2924GF-4GE/4C Quick Installation Guide
Legal Notices
Raisecom Technology Co., Ltd makes no warranty of any kind with regard to this manual,
including, but not limited to, the implied warranties of merchantability and fitness for a particular
purpose. Raisecom Technology Co., Ltd shall not be held liable for errors contained herein or direct,
indirect, special, incidental or consequential damages in connection with the furnishing, performance,
or use of this material.
Warranty.
A copy of the specific warranty terms applicable to your Raisecom product and replacement parts
can be obtained from Service Office.
Restricted Rights Legend.
All rights are reserved. No part of this document may be photocopied, reproduced, or translated to
another language without the prior written consent of Raisecom Technology Co., Ltd. The
information contained in this document is subject to change without notice.
Copyright Notices.
Copyright ©2011 Raisecom. All rights reserved.
No part of this publication may be excerpted, reproduced, translated or utilized in any form or by any
means, electronic or mechanical, including photocopying and microfilm, without permission in
Writing from Raisecom Technology Co., Ltd.
Trademark Notices
is the trademark of Raisecom Technology Co., Ltd.
Java"! is a U.S. trademark of Sun Microsystems, Inc.
Microsoft® is a U.S. registered trademark of Microsoft Corporation.
Windows NT® is a U.S. registered trademark of Microsoft Corporation.
Windows® 2000 is a U.S. registered trademark of Microsoft Corporation.
Windows® XP is a U.S. registered trademark of Microsoft Corporation.
Windows® and MS Windows® are U.S. registered trademarks of
Microsoft Corporation.
Contact Information
Technical Assistance Center
The Raisecom TAC is available to all customers who need technical assistance with a Raisecom
product, technology, or, solution. You can communicate with us through the following methods:
Address: Building 2, No. 28 of the Shangdi 6th Street, Haidian District, Beijing 100085
Tel: +86-10-82883305
Fax: +86-10-82883056
World Wide Web
You can access the most current Raisecom product information on the World Wide Web at the
following URL:
http://www.raisecom.com
Feedback
Comments and questions about how the ISCOM2924GF-4GE_4C device works are welcomed.
Please review the FAQ in the related manual, and if your question is not covered, send email by
using the following web page:
http://www.raisecom.com/en/xcontactus/contactus.htm.
If you have comments on the ISCOM2924GF-4GE_4C device specification, instead of the web page
above, please send comments to:
export@raisecom.com
We hope to hear from you!
CONTENTS
Chapter 1 Installation Tools---------------------------------------------------------------------------- 1
Chapter 2 Matters Needing Attentions ------------------------------------------------------------- 2
2.1 Electrostatic security------------------------------------------------------------------------------------------------------2
2.2 High pressure safety -----------------------------------------------------------------------------------------------------2
2.3 Earthing safety -------------------------------------------------------------------------------------------------------------2
Chapter 3 Installation Scenes ------------------------------------------------------------------------- 3
Chapter 4 Installation Conditions -------------------------------------------------------------------- 4
4.1 Working Environment ----------------------------------------------------------------------------------------------------4
4.2 Power conditions ----------------------------------------------------------------------------------------------------------4
4.3 Ground conditions ---------------------------------------------------------------------------------------------------------4
4.3.1 Unpack hardware ----------------------------------------------------------------------------------------------------------------------- 4
4.3.2 Install chassis to rack ------------------------------------------------------------------------------------------------------------------ 5
4.3.3 Connect to the earth-------------------------------------------------------------------------------------------------------------------- 6
4.3.4 Connect the power cables ------------------------------------------------------------------------------------------------------------ 7
Chapter 5 Check after Installation ------------------------------------------------------------------- 9
Chapter 6 Electricity Inspection -------------------------------------------------------------------- 10
6.1 Electricity preparation -------------------------------------------------------------------------------------------------- 10
6.2 Electricity inspection ---------------------------------------------------------------------------------------------------- 10
www.raisecom.com User Manual
Chapter 1 Installation Tools
Slotted screwdriver Cross point screwdriver Monkey wrench Cable grip
Wire-stripping pliers Antistatic glove Antistatic wrist strap
Optical power meter
Earth resistance tester
Multimeter
1
www.raisecom.com User Manual
Chapter 2 Matters Needing Attentions
2.1 Electrostatic security
Any time contact equipment or components wearing ESD wrist. ESD wrist should contact with the
skin, and insert the plug to ESD socket on the equipment.
2.2 High pressure safety
Avoid installation or demolition while the product is energized, to prevent the unforeseen personal
injury.
2.3 Earthing safety
Before the installation, ensure the device terminals have well connected to the engineering grounding
room.
2
www.raisecom.com User Manual
Chapter 3 Installation Scenes
The steps of equipment installation of ISCOM2924GF-4GE and ISCOM2924GF-4C are the same.
ISCOM2924GF-4GE/4C is supported in following scenes:
Øð ETS I600mm Rack
Øð 19-inch 450mm Rack
Øð 19-inch 600mm Rack
Øð Open Chassis
Øð Test Bench
3
www.raisecom.com User Manual
Chapter 4 Installation Conditions
4.1 Working Environment
Far from pollution, and environment with dust, harmful gases and explosives;
Physical address away from the transformer substation, the industrial boiler, heating boiler and
the wireless interference sources.
The equipment room height is not less than 2 m, laid anti-static raised floor.
Structure The load bearing must be over 600 kg/ m2. It also requires good ground
conditions, and ensures the correct ground connection after installation.
Working Temperature -5!~ 50!
Working Humidity 10% RH~ 90% RH, non-condensation.
Working pressure 86kPa~ 106kPa
Take the effective anti-static measure, the electrostatic voltage absolute value
ESD protection
must be less than 1000 V.
Seismic grade Up to eight-level seismic grade.
4.2 Power conditions
AC power The AC rated voltage is 220 V, voltage fluctuation range at 100V~ 240V.
DC Power The DC rated voltage is -48 V, voltage fluctuation range at -36 V ~ -72 V.
Alternative power Better to have special standby power, to keep equipment working.
The power provided by power is more than 55W if installing ISCOM2924GF-4GE device;
Power consumption
The power provided by power is more than 65W if installing ISCOM2924GF-4C device.
4.3 Ground conditions
The equipment adopts Common Earthing, and grounding resistance value is not more than 1 ©.
Good grounding is an important guarantee of anti-lightning as well as anti-interference.
4.3.1 Unpack hardware
1. Open the chassis
4
www.raisecom.com User Manual
Note: Unpacking the components must wear ESDwrist or ESDgloves.
4.3.2 Install chassis to rack
install left brackets of chassis
install right brackets of chassis
install floating nut
insert to rack
5
www.raisecom.com User Manual
4.3.3 Connect to the earth
ISCOM2924GF-4GE/4C device uses guideline of earth wire.
Item Indicators
Connector Bare Pressure Terminal-OT-2.5mm2-M4--Tin-round disconnects -16~14 AWG (1.3~ 2.0mm2);
Cables Electronic power cable-450V/750V-H07Z-K-2.5mm2-yellow green-LSOH flame-retardant cable;
1. Counterclockwise unscrew GND terminal on the back of the chassis.
2. Install earth wires.
3. Connect earth wires to earth bus in rack or equipment room.
6
www.raisecom.com User Manual
4.3.4 Connect the power cables
Øð Connect DC power cables:
1. Insert Dc power cables.
2. Tighten the screws
Øð Connect AC power cables:
1. open buckle of AC power
2. insert AC power line
3. press buckle of AC power
7
www.raisecom.com User Manual
Note:
Øð It is strictly prohibited to install the power cord in energized state.
Øð Power off before the completion of installation and wiring.
Øð Ensure earth wires has been grounded well.
8
www.raisecom.com User Manual
Chapter 5 Check after Installation
No. Content Method
1 All components are properly installed, and no broken or loose. view
2 Screws are tightened. view
3 Cable connection is correct, with no loose or virtual connection. view
4 Cable wiring in line with engineering requirements. view
5 Signal cable should be no damage, fracture, or middle connectors. view
6 The tail-fiber should avoid extrusion, so cable protectors are in need. view
The fiber curvature radius should be 20 times more than the fiber diameter,
7 view
usually the curvature radius should be more than 40 mm.
8 The ends labeling of signal cable is correct, clear, and tidy. view
9 The power cables and earth wire have reliable connection and good contacts. view
The power cables and earth wire should comply with the engineering
view
10
documents, facilitate following expansion.
11 The power cables and signal cables should be separate. view
12 Chassis surface have no stains and scratches. view
9
www.raisecom.com User Manual
Chapter 6 Electricity Inspection
6.1 Electricity preparation
No. Content Method
measuring
1 Via a multimeter detect DC power, ensure DC voltage is located between -36V ~ -72V.
instrument
measuring
2 By using a multimeter detect AC power, ensure AC voltage is located between 100V~ 240V.
instrument
measuring
3 The power capacity must support ISCOM2924GF-4GE/4C normal operations in max power.
instrument
Measure earth resistance of power earth wires and chassis GND terminals, which should be measuring
4
not more than 1 ©. instrument
6.2 Electricity inspection
No. Content Method
Accessing to the power, the indicators of panel should show correct. As
1 per service interface connected cables, its LINK/ACT indicator is view
always green ON; those not connected the cables, are always OFF.
Check whether fan module is running, indicators show right, and two
2 view
sides of the chassis have the air circulation.
Making use of optical power meter measure pluggable modules for P1. measuring
3
Compare it with indicators to confirm modules are working properly. instrument
The optical at ODF side connected with optical power meter, is
measuring
4 measured for P2. If the difference between P2 and P1 is less than 1 dB,
instrument
it means that optical fiber connections are normal.
10
Address: Building 2, No. 28 of the Shangdi 6th Street, Haidian District, Beijing Postcode:
100085 Tel: +86-10-82883305 Fax: +86-10-82883056 Email: export@raisecom.com
http://www.raisecom.com


Wyszukiwarka

Podobne podstrony:
Quick Reference Guide pl
EbookBot Installation Guide
install guide
HP System Management Homepage Installation Guide (March 2008)
Installation Guide
VCDS 10 6 Instalation Guide EN
c20h?8h?0h?0h installation guide
Red Hat Storage 2 0 Quick Start Guide en US
ATRIS Technik (2012 2) Install Guide
EGX300 Installation Guide (English)
Installation Guide for WindowsXP
Quick reference guide Fluke 1653
TOYOTA TIS Installation Guide(English)
Quick Visual Guide To Basic Aikido Tech
tech note quick install of high availability?d on
quick start guide

więcej podobnych podstron