PBO TD04 F14 Fuel Quality Report


0x08 graphic
0x01 graphic

Vessel's Name ………………………………………….

Owner ……………………………………………

Fuel supplier .………………………………………….

Name of barge or pier ……………………………..

Bunkering port and date

...................................................... ....................................

Full name and rank of ship's representative present during sampling (in block letters)

……………………………….........................................

Grade ordered

……..............….….

Bunker receipt data:

-viscosity ……………….

-density @15°C …………..

continuous drip

Sampling method spot

automatic

Marks on seals on FO or DO samples:

supplier's …………………

vessel's ……………………

(mark with “X” as appropriate)

Please attach a copy of the bunker receipt note with bunker receipt data.

Machinery report:

fuel temperature: - in settling tank °C

- in daily tank °C

settling tank draining: - frequency times/day

- approx. quantity of drained water litres/day

service tank draining: - frequency times/day

- approx. quantity of drained water litres/day

operation data of the centrifugal separators:

- fuel inlet temperature °C

- gravity disc diameter mm

- actual throughput capacity % of the rated

- time of operation hours/day

- intervals between sludge discharging hours

- intervals between manual bowl cleaning days

- intervals of ME/AE fine filter cleaning hours

- one separator in operation (tick off where appropriate)

- two separators in operation: - parallely

- in series

- centrifuging from settling tank to service tank

- recirculation by separator from service tank to service tank

- recirculation by separator from settling tank

to service tank and overflow to settling tank

- the above fuel has been mixed with the previously bunkered fuel yes no

observations whilst using the mentioned fuel

(tick off where appropriate and describe if necessary)

- problems with fuel pumps and injectors

- problems with purification, filter clogging, etc.

- problems with cylinder and exhaust system fouling

- drop in engine power

- no problems have been noted

additional comments by ship's staff:

__________________________________________________ ________________________

Chief Engineer (full name in block letters and signature) Date

Note: To be completed by case and filed in both office's file and ship's file.

To retain for 2 years.

Issue date: 03.11.2003/Rev. 00 PBO-TD04-F14 Page: 1/2

FUEL QUALITY REPORT

QSMS PBO-TD04-F14 Rev. No.00



Wyszukiwarka

Podobne podstrony:
PBO TD04 F09 Fuel consumption statement
PBO TD04 F11?ily Report on Excessive Fuel Consumption
PBO-TD04-F12 The Running Time of ME& Oth. Fuel Cons, Akademia Morska, Chipolbrok
PBO TD04 F04 Voyage report for power engineering?partment
PBO TD04 F08 Actual average speed and daily fuel oil consump
PBO G 09 F05 Internal audit report
PBO G 08 F03 Follow up report of management review
PBO G 07 F02 Master's complaint reports
PBO TD02 F04 Voyage maintenance report
PBO TD04 F06 Consumption of lubricating oils of auxiliary gr
PBO TD04 F01 Standards of vessel speed and daily consumption
PBO TD04 F03 Annual plan of F O & L O consumption during r
PBO TD04 F07 Control sounding list
PBO TD04 F02 Annual plan of lubricants expenses
PBO TD04 F10 Actual consumption of L O
PBO G 08 F05 Report of management review
PBO G 09 F07 Quality & safety system audit checklist in?pa
PBO TD03 F03 Docking report
PBO TD03 F02 Report of constant?lculation when docking

więcej podobnych podstron