suziki rm12501

suziki rm12501



KICK STARTER 8-5

• Install the spring guide (D with the groove ® of the spring guide engaged with the return spring d).

• Install the kick starter @ to the kick starter shaft.

NOTĘ:

Be surę to align the punch marks on the kick starter and kick starter shaft when fitting the kick starter.

Install the kick starter ass’y to the crankcase. spring d).

Reassemble the kick idle gear.

Reassemble the primary driven gear ass ar7=7-5, 7)

• Reassemble the clutch cover © and kick lever ©.

H Clutch cover bolt: 11 N-m (1.1 kgf-m, 8.0 Ib-ft) Kick lever bolt: 23 N-m (2.3 kgf-m, 16.5 Ib-ft)

• Install the kick starter lever with punch mark on the lever aligned with the punch mark on the kick shaft.






Wyszukiwarka

Podobne podstrony:
suziki rm12500 8-4    KICK STARTERINSPECTION • Inspect the oil seal © for oil leakag
suziki rm12502 8-6 KICK STARTER •    Reassemble the rear brake pedał. ((^/“IS-IS) •
87347 Suzuki RM1252 8-6 KICK STARTER •    Reassemble the rear brake pedał. (£7° 15-1
25846 Suzuki RM1250 8-4 KICK STARTERINSPECTION • Inspect the oil seal © for oil leakage and oil sea
Suzuki RM1251 KICK STARTER 8-5 ♦ Install the spring guide © with the groove ® of the spring guide e
suziki rm12507 GEARSHIFTING 9-5 GEARSHIFTING 9-5 Align the pin groove ® with the pin © when install
73228 Suzuki RM125# 2-8 PERIODIC MAINTENANCE • Install the air cleaner box lid properly as shown. NO
89 TransAlp Manual Electric Starter 6 ELECTRIC STARTER Install the shims in the same location and n
72486 Suzuki RM125? KICK STARTER 8-3KICK STARTERREMOVAL ♦    Drain transmission oil.
77912 Suzuki RM250h KICK STARTER 6-5 •    Installthe clutch. (C715-7) ♦   &
suziki rm12506 9-4 GEARSHIFTING Remove the spring ®. Remove the gearshift cam stopper • Remove the
suziki rm12519 10-10 TRANSMISSION AND CRANKSHAFT INSTALLATION • Press the bearings with the special

więcej podobnych podstron