suziki rm12540

suziki rm12540



ELECTRICAL SYSTEM 13-3

IGNITION SYSTEM

IGNITION SYSTEM PEAK VOLTAGE INSPECTION

•    Remove the seat and fuel tank.

•    Remove the spark pług.

•    Disconnect the magneto lead wire coupler ©.

Measure the ignition system peak voltage in the following procedurę:

•    Connect the multi Circuit tester with peak volt adaptor as fol-lows. (See table below.)

•    Measure the highest peak voltage by depressing the kick starter lever several times forcefully.


IiTTTliTTTi iii

Red/White- Black/Red

30 V and morę

Green - Red

3 V and morę


0 09900-25008: Multi Circuit tester set Tester knob indication: Voltage (“)


•    Connect the magneto lead win ignition coil lead wire coupler

•    Connect the multi between Black/Whit

•    Measure the highes starter lever several ti

U7.U-1

IiTTTliTTTi iii




ak volt adaptor e/Blue lead wire. by depressing the kick


Black/White - White Blue


210 V and morę

ct the


NOTĘ:

Be surę the Red probe pin to connected to the Black/White lead wire and Black probe pin to the White/Blue lead wire.



Wyszukiwarka

Podobne podstrony:
suziki rm12542 ELECTRICAL SYSTEM 13-5 H7-U-1 IiTTTliTTTi iii Unit:
suziki rm12544 ELECTRICAL SYSTEM 13-7 •    Install the magneto rotor. •   
suziki rm12529 FUEL SYSTEM 11-7REED VALVEREMOVAL •    Remove the carburetor. (d/“ 11
Suzuki RM2508 17-2 ELECTRICAL SYSTEMELECTRICAL CIRCUITIGNITION SYSTEM PEAK VOLTAGE ♦   &n
Suzuki RM2508 17-2 ELECTRICAL SYSTEMELECTRICAL CIRCUITIGNITION SYSTEM PEAK VOLTAGE ♦   &n
Suzuki RM1250 ELECTRICAL SYSTEM 13-3 ELECTRICAL SYSTEM 13-3 x vIGNITION SYSTEMIGNITION SYSTEM PEAK
22079 Suzuki RM1252 ELECTRICAL SYSTEM 13-5 [3523 ■nfTTnrni Unit: V Positive © probe pin (Diodę
80798 Suzuki RM1254 ELECTRICAL SYSTEM 13-7 ♦    Install the magneto rotor. ♦  &
suziki rm12527 FUEL SYSTEM 11-5CLEANING After cleaning, reassemble theo Replace the removei A WARNI
suziki rm12532 COOLING SYSTEM 12-3 COOLING SYSTEM 12-3 tor cap pres-ENGINE COOLANTENGINE COOLANT RE
suziki rm12536 COOLING SYSTEM 12-7 • Press the bearing with the special tool. (S) 09913-70210: Bear
suzuki rm25099 ELECTRICAL SYSTEM 17-3 Measure the ignition system peak voltage in the following pro
Suzuki RM2509 ELECTRICAL SYSTEM 17-3 Measure the ignition system peak voltage in the following proc

więcej podobnych podstron