Suzuki RM125p

Suzuki RM125p



5-6 ENGINE REMOVAL AND INSTALLATION

•    Remove the cotter pin ® and brake pedał pivot bolt ®.

•    Remove the brake pedał.



• Disconneet the cluteh cable.

NOTĘ:

Loosen the clutch cable adjuster when disconnecting. (CT2-12)




Wyszukiwarka

Podobne podstrony:
Suzuki RM125h 5-4 ENGINE REMOVAL AND INSTALLATION • Remove the exhaust pipę fiłting springs with the
Suzuki RM125r 5-8 ENGINE REMOVAL AND INSTALLATIONINSTALLATION •    Reassemble the rem
39359 Suzuki RM125s ENGINE REMOVAL AND INSTALLATION 5-9 * Reassemble the drive Chain clip so the sli
25719 Suzuki RM125i ENGINE REMOVAL AND INSTALLATION 5-5 ♦    Disconnect the radiator
18581 Suzuki RM125g ENGINE REMOVAL AND INSTALLATION 5-3ENGINE REMOYAL AND INSTALLATIONREMOVAL ♦ &nbs
Suzuki RM125f 5-2 ENGINE REMOVAL AND INSTALLATIONEXTERIOR PARTS ! /     7*" K&q
36818 Suzuki RM125q ENGINE REMOVAL AND INSTALLATION 5-7 engine mounting bolts and plates swlngarm pi
suzuki rm25014 EXHAUSTVALVE 11-5 EXHAUSTVALVE 11-5 Remove the retainer © and the exhaust main valve
suzuki rm25000 17-4 ELECTRICAL SYSTEMIGNITION COIL •    Remove the seat and fuel tan

więcej podobnych podstron