Suzuki RM125r

Suzuki RM125r



5-8 ENGINE REMOVAL AND INSTALLATION

INSTALLATION

•    Reassemble the removed parts in the reverse order of removal.

•    Fit the swingarm in its position and hołd it with the swingarm pivot shaft.

•    Mount the engine on the frame.

•    Apply THREAD LOCK SUPER to the engine mounting bolt

©.

tS 99000-32030: THREAD LOCK SUPER “1303”

Tighten the engine mounting nuts.


Bolt Length

©

45 mm (1.8 in)

47.5 mm (1.9 in)

©

90 mm (3.5 in)

©

130 mm (5.1 in)

H Tightening torque


N-m

kgf-m

Ib-ft

<D (Bolt, Washer, Nut)

43

4.3

.3.1 $ \ )

r \ \ v"

(Bolt, Nut)

44

4.4 C

X \A \ \ Ą v x \32,Ó, \ \

A W W \ ^

® (Shaft, Washer, Nut)

\

o

M\\

> • V „

\ \\M v'"'

\ \ 50.5

\ s.S'

\ .

NOTĘ:    ---    . ,•

/    i



Repface the seif-tocking nuts with nęw ones.

•    Route the cables, lead wires and hoses correctly. (CCT^IS-IO, 11,12,13,16,17)

•    Insert the clutch cable positively.

Reassemble the brake pedał correctly. (Cr'15-15)



Wyszukiwarka

Podobne podstrony:
39359 Suzuki RM125s ENGINE REMOVAL AND INSTALLATION 5-9 * Reassemble the drive Chain clip so the sli
Suzuki RM125p 5-6 ENGINE REMOVAL AND INSTALLATION •    Remove the cotter pin ® and br
Suzuki RM125h 5-4 ENGINE REMOVAL AND INSTALLATION • Remove the exhaust pipę fiłting springs with the
25719 Suzuki RM125i ENGINE REMOVAL AND INSTALLATION 5-5 ♦    Disconnect the radiator
18581 Suzuki RM125g ENGINE REMOVAL AND INSTALLATION 5-3ENGINE REMOYAL AND INSTALLATIONREMOVAL ♦ &nbs
Suzuki RM125f 5-2 ENGINE REMOVAL AND INSTALLATIONEXTERIOR PARTS ! /     7*" K&q
36818 Suzuki RM125q ENGINE REMOVAL AND INSTALLATION 5-7 engine mounting bolts and plates swlngarm pi
NS/GS9 - 58 ENGINE- REMOVAL AND INSTALL ATI ON (COfltmued) Fig. 30 Mess uring Platon Protmaion Mao
64002 Suzuki RM250B ENGINE DISMOUNTING AND MOUNTING 3-3 Disconnect the radiator hoses CD. Disconnect

więcej podobnych podstron