18581 Suzuki RM125g

18581 Suzuki RM125g



ENGINE REMOVAL AND INSTALLATION 5-3

ENGINE REMOYAL AND INSTALLATION

REMOVAL

♦    Drain transmission oil. (CJ"2-9)

♦    Drain engine coolant. (O" 12-3)

♦    Remove the seat (i).

Remove the fuel tank mounting bolts ®T left and rightC^ Remove the fuel tank by unhooking the band-,®, from the

, \\N\ \\

\ \\ ) ^


Tum the fuel valve lever to the “OFF” position and disconnect the fuel hose (2).


hooked part.




Wyszukiwarka

Podobne podstrony:
Suzuki RM125p 5-6 ENGINE REMOVAL AND INSTALLATION •    Remove the cotter pin ® and br
Suzuki RM125f 5-2 ENGINE REMOVAL AND INSTALLATIONEXTERIOR PARTS ! /     7*" K&q
Suzuki RM125h 5-4 ENGINE REMOVAL AND INSTALLATION • Remove the exhaust pipę fiłting springs with the
Suzuki RM125r 5-8 ENGINE REMOVAL AND INSTALLATIONINSTALLATION •    Reassemble the rem
36818 Suzuki RM125q ENGINE REMOVAL AND INSTALLATION 5-7 engine mounting bolts and plates swlngarm pi
39359 Suzuki RM125s ENGINE REMOVAL AND INSTALLATION 5-9 * Reassemble the drive Chain clip so the sli
25719 Suzuki RM125i ENGINE REMOVAL AND INSTALLATION 5-5 ♦    Disconnect the radiator
Suzuki RM250A 3-2 ENGINE DISMOUNTING AND MOUNTINGENGINE DISMOUNTING •    Drain transm
Suzuki RM2509 FRONT AND REAR BRAKES 14-7FRONT CALIPER REMOVAL AND DISASSEMBLY ♦    D
68156 Suzuki RM1259 FRONT AND REAR BRAKES 15-7FRONT CALIPER REMOVAL AND DISASSEMBLY ♦   &

więcej podobnych podstron