36818 Suzuki RM125q

36818 Suzuki RM125q



ENGINE REMOVAL AND INSTALLATION 5-7

engine mounting bolts and plates


swlngarm pivot shaft nut and wash.er

*    Extract three quarters of the swingarm pivot shaft so as to keepthe swingarm in position.

NOTĘ:

The swingarm will come off when the swingarm pivot shaft is completely removed.

♦    Remove the engine from the frame.



Wyszukiwarka

Podobne podstrony:
Suzuki RM125p 5-6 ENGINE REMOVAL AND INSTALLATION •    Remove the cotter pin ® and br
18581 Suzuki RM125g ENGINE REMOVAL AND INSTALLATION 5-3ENGINE REMOYAL AND INSTALLATIONREMOVAL ♦ &nbs
Suzuki RM125f 5-2 ENGINE REMOVAL AND INSTALLATIONEXTERIOR PARTS ! /     7*" K&q
Suzuki RM125h 5-4 ENGINE REMOVAL AND INSTALLATION • Remove the exhaust pipę fiłting springs with the
Suzuki RM125r 5-8 ENGINE REMOVAL AND INSTALLATIONINSTALLATION •    Reassemble the rem
39359 Suzuki RM125s ENGINE REMOVAL AND INSTALLATION 5-9 * Reassemble the drive Chain clip so the sli
25719 Suzuki RM125i ENGINE REMOVAL AND INSTALLATION 5-5 ♦    Disconnect the radiator
ENGINE COOLING SYSTEM _Water Pump_ REMOVAL AND INSTALLATION •    When removing water
NS/GS9 - 58 ENGINE- REMOVAL AND INSTALL ATI ON (COfltmued) Fig. 30 Mess uring Platon Protmaion Mao

więcej podobnych podstron