78 9dc0051e75

78 9dc0051e75



ENGINE DISASSEMBLY


E m


%

%





6. Remove:

©Clutch housing (J) ©Spacer (5)

©Thrust washer (|) ©Primary drive gear @ ©Straight key (§) ©Collar (f)

KICK AXLE

NOTĘ:__

With the engine mounted, the kick axle and kick idle gear can be maintained by removing the fol-lowing parts.

©Lower cowling

©Autolube pump cable and hoses ©Crankcase cover (Right)

©Clutch

1.    Unhook the spring (J).

2.    Remove:

©Kick axle assembly (2)

3. Remove:

©Circlips (j) ©Washer (2)

©Kick idle gear (3)

4-8


Wyszukiwarka

Podobne podstrony:
76 97843c7aa4 ENGINE DISASSEMBLY 4. Remove: ° Piston pin o Piston o Smali end bearing NOTĘ:
80 dad36e767f ENGINE DiSASSEWBLY 3. Remove: ©Stator (T) ©Neutral switch lead © CRANKCASE 1. Remove:
ENGINE OVERHAUL Inspection.Disassembly 3. Remove crankshaft. PISTON 1. Place engine on work
FRONT DISC BRAKE (CL16) — Caliper _Disassembly_ Remove brake hose. Push out piston with dust seal us
79 58cc913090 ENGINE DISASSEMBLY SHIFT SHAFT IMOTE: __ With the engine mounted, the shift shaft can
81 f6e651cbb1 ENGINE DISASSEMBIY 4. Attach: ©Crankcase Separating Tool © Crankcase Separating »oof:
89 TransAlp Manual General Specifications Service 3 MAINTENANCECYLINDER COMPRESSION Warm up the eng
70714 Suzuki RM250? 9-10 FUEL SYSTEMCARBURETORREMOVAL AND DISASSEMBLY •    Remove the
25868 Suzuki RM2501 16-18 REAR SUSPENSION Jtć* Remove the spacers. Dust seal Washer Thrus
Suzuki RM125p 5-6 ENGINE REMOVAL AND INSTALLATION •    Remove the cotter pin ® and br
ST Z11 04 ST-Z11■ DISASSEMBLY INSTRUCTIONS • Ho w to remove the cabinet and bottom board 1.  &n
Rozrzad 3 ENGINE-’L’ SERIES 17.    Remove and discard 3 Torx screws securing dam
Rozrzad 4 ENGINE-’L’SERIES 24.    Remove timing belt tensioner access pług from 
71 f4b2bc4c22 ENG ENG8NE REMOVALENGINE OVERHAUL ENGINE REMOVAL NOTĘ: _-_ ®lt is not necessary to rem
75 1acd287192 EMOiME DISASSEMBIYENGINE DSSASSEMBLY CYLINDER HEAD, CYLINDER AND PISTON NOTĘ: ________

więcej podobnych podstron