76 97843c7aa4

76 97843c7aa4



ENGINE DISASSEMBLY




4. Remove:

° Piston pin o Piston

o Smali end bearing

NOTĘ: —........................

Before removing the piston pin, deburr the clip grooved and pin hole area. If the piston pin groove is deburred and piston pin is still difficult to re* rnove, use Piston Pin Puller.


Piston Pin Puller: YU-01304


CAUTiGN:|_

Do not use a hammer to drive the piston pin out.


CLUTCH AND PRIMARY DR3VE GEAR

NOTĘ: ———————._,_

With the engine mounted, the clutch and primary drive gear can be maintained by removing the fol-lowing parts.

°Lower cowl

°Autolube pump cable and hoses



1. Remove:

®Kick crank (T)

°Crankcase cover (Right) @



2. Remove:

®Bolts (Pressure piąte) © ^Springs (Pressure piąte)


4-6



Wyszukiwarka

Podobne podstrony:
78 9dc0051e75 ENGINE DISASSEMBLYE m % % 6. Remove: ©Clutch housing (J) ©Spacer (5) ©Thrust washer (
80 dad36e767f ENGINE DiSASSEWBLY 3. Remove: ©Stator (T) ©Neutral switch lead © CRANKCASE 1. Remove:
ENGINE OVERHAUL Inspection.Disassembly 3. Remove crankshaft. PISTON 1. Place engine on work
FRONT DISC BRAKE (CL16) — Caliper _Disassembly_ Remove brake hose. Push out piston with dust seal us
87830 Suzuki RM125? CYLINDER, PISTON AND EXHAUST VALVE 6-13 ♦ Remove the pin ® by pushing the retain
ENGINE OVERHAULInspection (Cont d) PISTON RING GAP CRANKSHAFT INSPECTION 0.8(0.031) / Ring gap mm
79 58cc913090 ENGINE DISASSEMBLY SHIFT SHAFT IMOTE: __ With the engine mounted, the shift shaft can
81 f6e651cbb1 ENGINE DISASSEMBIY 4. Attach: ©Crankcase Separating Tool © Crankcase Separating »oof:
89 TransAlp Manual General Specifications Service 3 MAINTENANCECYLINDER COMPRESSION Warm up the eng
70714 Suzuki RM250? 9-10 FUEL SYSTEMCARBURETORREMOVAL AND DISASSEMBLY •    Remove the
ENGINE OVERHAULAssembly (Cont d) 2. Select suitable thickness of main bearing according to the follo
ENGINE OYERHAULAssembly (Cont d) 6. Measure connecting rod clearance. 5. Tighten bearing cap bolts t
31. Adjust brake band arfollows. 1) First torque anchor end pin. E2 Anchor end pin 4 - 6 N-m (0 4 -0
75 1acd287192 EMOiME DISASSEMBIYENGINE DSSASSEMBLY CYLINDER HEAD, CYLINDER AND PISTON NOTĘ: ________
Suzuki RM125p 5-6 ENGINE REMOVAL AND INSTALLATION •    Remove the cotter pin ® and br
ENGINE OVERHAUL.Cylinder Błock, Crankshaft and Piston (3.0 - 3.5, 22 - 25) :i a IR 46.52 (4.7 - 5.3,
REYERSE ENGINEERING - PISTON SCANNING Abstract The aim of this work was to use reverse engineering t

więcej podobnych podstron