77

77



ENGINE OVERHAUL

Inspection (Cont'd)

PISTON RING GAP


CRANKSHAFT INSPECTION

0.8(0.031)


/


Ring gap mm (in)

Top ring

No. 1 grade    0.21    ■ 0.30 (0.0083    - 0.0118)

No. 2 and 3 grade 0.18    - 0.30 (0.0071    -0.0118)

2nd ring    0.15    - 0.34 (0.0059    - 0.0134)

Oil ring    0.20    ■ 0.69 (0.0079    - 0.0272)

Max. tolerance of

ring gap:

BEARING CLEARANCE

CAUTION:

•    Do not tum crankshaft or connecting rod while the plastigage is being inserted.

•    When bearing clearance exceeds the specified

limit,, make surę that a proper bearing has been installed. Then if excessive bearing clearance exists, use a thicker bearing or an undersized bearing so that the specified bearing clearance is obtained.    - o- >

1    v»    i’ .. ^

1.    Check crankshaft journals for score, bias, wear or cracks. If faults are minor, correct with fine crocus cloth.

2.    Check journals with a micrometer for taper anc out-of-round.

Out-of-round (X-Y)

0.01 mm (0.0004 in)

Taper (A-B):

Less than 0.02 mm (0.0008 in)

EM75

a. When regrinding crank pin journal, measur "L" dimension in fillet roli. Make surę that th measurements exceed the specified limit. If th measurements are within the specified limit, not regrind it.

Bearing clearance Main bearing

0.03 - 0.05 mm (0.0012 - 0.0020 in) Limit 0.075 mm (0.0030 in) Connecting rod bearing

0.02 - 0.06 mm (0.0008 - 0.0024 in) . _ Limit 0.12 mm (0.0047 in)



Wyszukiwarka

Podobne podstrony:
SERVICE DATA AND SPECIFICATIONS (S.D.S.)Inspection and Adjustment (Cont d)Piston ring Unit: mm (in)C
ENGINE OVERHAULAssembly (Cont d) 2. Select suitable thickness of main bearing according to the follo
suziki rm12513 18-2 SERVICING INFORMATIONSERVICE DATACYLINDER + PISTON + PISTON RING Unit: mm
Suzuki RM125!3 18-2 SEFWICING INFORMATIONSERVICE DATACYLINDER + PISTON + PISTON RING Unit: mm
ENGINE OVERHAUL Inspection.Disassembly 3. Remove crankshaft. PISTON 1. Place engine on work
ENGINE OVERHAUL— Inspection (Cont d)_ CRANKSHAFT RUNOUT Check crankshaft runout. CYLINDER BORĘ Using
ENGINE OVERHAUL_Inspection (Cont d)— PISTON TO CYLINDER WALL CLEARANCE 1. Measure piston
ENGINE OVERHAUL.Cylinder Błock, Crankshaft and Piston (3.0 - 3.5, 22 - 25) :i a IR 46.52 (4.7 - 5.3,
97 c4d5343974 ENGINE ASSEMBLY AND ADJUSTOIENT ENGCRANKSHAFT, PISTON AMD PISTON RING © Crankshaft a
ENGINE OVERHAULAssembly_ PISTON Main bearing selection a.    Numbers are stamped on t
suzuki rm25008 19-2 SERVICE DATASERVICE DATA CYLINDER + PISTON + PISTON RING ITEM STD/SPEC. LIMIT
ENGINE MAINTENANCE (Cont d)Before Engine REPLACING P.C.V. FILTER Remove air cleaner cover, and repla
ENGINE MAINTENANCEBefore Engine Starts (Cont d) 1. To flush system, open drain cock at bottom of&nbs
ENGINE MAINTENANCEBefore Engine Starts (Cont d) 9. Refill engine with the appropriate new engine&nbs
ENGINE MAINTENANCEBefore Engine Starts (Cont d) Spark pług: Canada Standard type BPR5ES Hot
76 97843c7aa4 ENGINE DISASSEMBLY 4. Remove: ° Piston pin o Piston o Smali end bearing NOTĘ:
ENGINE OYERHAULAssembly (Cont d) 6. Measure connecting rod clearance. 5. Tighten bearing cap bolts t
89 TransAlp Manual Cylinder Piston 1 10. CYLINDER/PISTON SERN/ICE INFORMATION 10-1 PISTON RING

więcej podobnych podstron