30
ENGINE MAINTENANCE
Before Engine Starts (Cont'd)
1. To flush system, open drain cock at bottom of radiator. Then thoroughly flush until elear water comes out.
Loosen
Loosen ^
CS009
2. Close drain cock.
3. Fili radiator with coolant up to specified level. Follow instructions attached to anti-freeze Container for mixing ratio of anti-freeze to water.
Coolant capacity:
Without heater
4.3 liters (4-1/2 US qt, 3-3/4 Imp qt) With heater
4.7 liters (5 US qt, 4-1/8 Imp qt)
4. Run engine for a few minutes, and then check coolant level, and check drain cock and pług for any sign of leakage.^ /■ V 1
C HANG ING .ENGINE OIL AND REPLACING
'^>b«Cł0.j BHJ X iLu j iaVh.i
OIL FILTER
.:od ii ji*ign& dnt nenw
1. Start engine and warm it up until water tem-^perature^indicator points toimiddle of gauge,
then turn off engineTCH"
2. Remove oil filier cap and oil pan drain pług, and ailow oil to drain.
WARNING:
To avoid the danger of being scalded, never a tempt to change engine oil when the engine is hot
Puli out
SMA503A
• A milky oil indicates the presence of cooling water. Isolate the cause and take corrective measure.
• An oil with extremely Iow viscosity indicates dilution with gasoline.
3. Using oil filter wrench, remove oil filter.
4. After draining engine oil, wipe oil pan drain hole with a clean rag.
5. Clean and install oil pan drain pług with washer.
6. Wipe oil filter mounting surface with a clean rag.
7. Smear a little engine oil on rubber seal of new oil filter.
Screw in oil filter until a slight resistance is felt, then tighten an additional 2/3 turn.
Wyszukiwarka
Podobne podstrony:
ENGINE MAINTENANCEBefore Engine Starts (Cont d) Installation 1. Confirm that No. 1 cylinder is at T.ENGINE MAINTENANCEBefore Engine Starts (Cont d) 9. Refill engine with the appropriate new engine&nbsENGINE MAINTENANCEBefore Engine Starts (Cont d) Spark pług: Canada Standard type BPR5ES Hot*ENGINE MAINTENANCEBefore Engine Starts (Cont d) REPLACING TIMING BELT Removal 1. step41 align part 58 with part 60 at bottom of part 61 glue flaps of part 60 to bottom of overlap ofMSc IN CONTROL ENGINEERING AND ROBOTICS specialization: Decision Systems to be obtained Master ofENGINE MAINTENANCEBefore Engine Starts CHECKING DRIVE BELT 1. Inspect for cracks fENGINE OVERHAULAssembly (Cont d) 2. Select suitable thickness of main bearing according to the folloENGINE OYERHAULAssembly (Cont d) 6. Measure connecting rod clearance. 5. Tighten bearing cap bolts t1.1 Czym jest informatyka? 13 to predict new observations. For engineered systems, the object is toExtreme Genetic Enginering An Introduction to Synthetic Biology EXTREME GENETIC ENGINEERING An Intr46902 Suzuki RM2506 10-4 COOLING SYSTEMWATER PUMP • Drain the engine coolant. (CZsuzuki rm25006 10-4 COOLING SYSTEMWATER PUMP • Drain the engine coolant. (d7“ 2-1ENGINE OVERHAULInspection (Cont d) PISTON RING GAP CRANKSHAFT INSPECTION 0.8(0.031) / Ring gap mmComputer Aided Systemslvan Kurie Prof. Ivan Kurie , University of Zilina, Faculty of Mechanical EngiCooperation and support Engineering. Manufacturlng. Testing. POLITYKA ZINTEGROWANEGO SYSTEMU ZARZĄDZSyllabus for B.Tech(APPLIED ELECTRONICS ANI) INSTRUMENT ATI ON ENGINE ERING) Up to Fourth Year Revisbild174 J.A.P. Engines are fitted to the following British Makes ALLDAYS MORGAN THREE-WHEELER BRwięcej podobnych podstron