Mounting procedure lower gear030 CP englisch


DISMANTLING of LOWER GEARBOX

For the dismantling of the underwater gearbox please proceed as follows:

Dismantle the propeller blades and the nozzle. Cover the openings of the propeller hub.

For the later dismantling and mounting of the underwater gearbox you should add a retaining plate on each side of the nozzle connection on the underwater gearbox.

On each side of the retaining plate are two (2) lifting pads weld on.

For the lifting procedure by four (4) chains hoist block please provide four (4) lifting pads at the hull (bevelled above).

Now dismantle the gearbox cap and detach the mechanical feedback unit (flexball) and cover the gearbox.

By using chain hoist blocks assure the gearbox and dismantle the bolted connection.

Attention: weight of underwater gearbox with transmission shaft, approx. 15 tons.

Afterwards drop down slowly the underwater gearbox and cover the underwater gearbox with the gearbox cap.

Attention: Transmission shaft strikes down with the underwater gearbox.

MOUNTING OF LOWER GEARBOX

For the mounting of the underwater gearbox please proceed as follows:

For boosting you have to screw-on lateral the retaining plates of the underwater gearbox again.

Fix the underwater gearbox beneath the SRP together with vertical transmission shaft.

In each front and back third of the underwater gearbox you have to screw in two (2) thread bolts, (length approx. 1000 mm). After that dismantle the gearbox cap and cover the gearbox.

Lift up slowly the underwater gearbox and the transmission shaft with the chain hoist block and insert the mechanical feedback unit into the gearbox.

In this case pay attention that the underwater gearbox is parallel pulled up.

When intermediate size of approx. 500 mm (verify size between both screw up plains) you should start to lift up parallel the gearbox with the aid of thread bolts.

Hereby turn slowly the power input shaft at the upper gearbox until the profile of the transmission shaft with the profile of the upper water bevel gear set is connected again.

Flange plains have to endue with sealing material and screw-on the lower gearbox. Remount the nozzle as well as the propeller blades.

Installation description for dismantling and mounting of the Underwater gearbox of SRP 3030 CP

26.09.2006 Conny Wahl - VB4 Version 1 (Original) Page 1/1

0x01 graphic



Wyszukiwarka

Podobne podstrony:
Mounting procedure lower gear
Mounting procedure lower gear
Mounting procedure complete unit
Mounting procedure complete unit
Dismantling Procedure complete unit SRP030 CP
Firmware Update Procedure TX NR807 English
PROCEDURA OLUP
IntroductoryWords 2 Objects English
06 pamięć proceduralna schematy, skrypty, ramyid 6150 ppt
LAB PROCEDURY I FUNKCJE
proces nbsp pomocy nbsp, nbsp strategie nbsp i nbsp procedury nbsp SWPS[1][1] 4
Lower Limb Jeopardy
Procedura systemowa Nadzór nad produktami niezgodnymi
English for CE materials id 161873
120222160803 english at work episode 2
English, Intermediate Grammar Questions answers
Lesley Jeffries Discovering language The structure of modern English
procedura wypadek

więcej podobnych podstron