11/20
Latest developments in ammonia production technology
Figurę 7. HTER internat being installed
Figurę 8 shows the layout of the reforming section after revamp. Since the initial start-up, no unforeseen stops were related to the HTER, and the HTER has been in continuous operation with the exception of planned shut-downs. This has led to a high availability factor (97%).
Figurę 8. Layout of reforming section revamped with HTER
RESEARCH | TECHNOLOGY | CATALYSTS